Hey Paul Mine came in this evening....... they are a piece of art....... thanks you very much. Now time to figure out what 13 in set up all around..... got a bigger brake booster, and a bias control module. I think corvette C6 is the way to go. THX again .... and a bump for you. Danyel
Guru, can these hubs be supplied in the correct diameter to fit inside Grand Am rotors - for a Grand Am front brake upgrade?
Yes, I can supply them machined for any brake kit.
I have increased the shipping surcharge to Canada to $35. USPS flat rate shipping in the US is $17.45 and is included in the purchase of the kit. Shipping the same box to Canada is $55.75 or $38.30 additional, so the $35 surchage covers most of the increase in shipping.
Ok,thanks.I have ATE premium 1 Grand am rotors that are on the car now.I will take them off on the next warmer day and measure the needed diameter.I am using concentric rings,so the diameter doesn't have to be tight to the rotor ID like the upgrade write-ups say,but it would be better I think.How much under the Grand am rotor ID would you recommend machining the Fiero hub OD?
Ok,thanks.I have ATE premium 1 Grand am rotors that are on the car now.I will take them off on the next warmer day and measure the needed diameter.I am using concentric rings,so the diameter doesn't have to be tight to the rotor ID like the upgrade write-ups say,but it would be better I think.How much under the Grand am rotor ID would you recommend machining the Fiero hub OD?
I already have the needed dimension (done quite a few of these) and have test rotors to verify fit. I target about .010" clearance between the two parts. Go much more and the cast iron around the wheel stud is further reduced and increases the change for cracking, go any less and then they might not slide on freely due to mfg tolerances.
Here are a couple of stacks of paper weights:
[This message has been edited by fieroguru (edited 03-11-2014).]
My local NAPA keeps 6 of these in stock for me now. I try to keep up to 3 sets of the 610-323 wheel studs in stock as well so the turn around is usually 1-2 days now.